Every contractor has heard the line from a client’s HR: “agar aapne salary nahi di, to hamein deni padegi.” That is the law. Under the OSH Code and the Code on Social Security the contractor is the employer and pays wages, PF and ESI, but the principal employer stands behind him. If the contractor fails, the principal employer pays and then recovers from the contractor’s bills or security. This post explains who is liable for what, the time limits, and what a contractor should send the principal employer every month so that the question never comes up.
The contractor is the employer
For contract labour, the contractor engages, supervises and pays the workers. He registers them in PF and ESI, keeps the registers, issues the appointment letter and wage slip, and files the returns. The principal employer is the company or department whose work is done: a factory, a refinery, a builder, a hospital.
The principal employer’s own duties are mostly to check and to step in: register the establishment, use only a licensed contractor where a licence is needed, provide welfare facilities at its premises, and pay when the contractor does not.
Wages: the 7-day and 15-day rule
The contractor pays wages for each wage period (not longer than a month) before the 7th day after the period ends expires, by bank or electronic transfer, and tells the principal employer electronically how much was paid (OSH Central Rules r.98(1), (2), (4)). The wage period and pay date are displayed at the site and a copy goes to the principal employer (r.98(6)).
| Situation | What happens | Law |
|---|---|---|
| Contractor has not paid within 7 days of the wage period’s end | Principal employer pays the wages within 15 days | OSH Code s.55(3); r.98(8) |
| Contractor paid less than due | Principal employer pays the unpaid part | s.55(3) |
| Principal employer paid on the contractor’s behalf | Recovers it from the contractor’s bills, as a debt, or from the security deposit | s.55(3) |
| Security deposit used for wages | Contractor tops it up within 15 days, or the licence can be suspended | s.55(4); r.86(2), r.99 |
| Bills for worker dues | Principal employer settles them within the agreed timeline | r.98(3) |
The old rule that wages be paid “in the presence of the principal employer’s representative” is gone. In its place the principal employer needs proof: the bank payment with UTRs. A contractor who sends that proof on time is protected; one who does not gives the client reason to hold his bill.
PF and ESI for contract workers
- PF: if the principal employer pays PF dues for contract workers, it may recover them from the contractor (SS Code s.17). The contractor may deduct only the worker’s 12% from wages, never the employer’s share or admin charges.
- ESI: the Code makes the principal employer liable to pay both shares for every employee, including those engaged through a contractor (SS Code s.31(1)). It can recover them from the contractor’s bills or as a debt (s.31(6)), and the contractor keeps a register of these workers and gives it to the principal employer (s.31(7)). In practice the contractor pays under his own ESI code.
- All contract labour must be enrolled in PF and ESI where those laws apply (OSH Central Rules r.93(4)).
In practice the contractor files the ECR and the ESI contribution under his own codes, and the principal employer checks the challans every month before it releases the bill.
Verify: Under the EPF Scheme 2026 the principal employer files a list of contractors (Form X), the contractor gives Form XI (UAN, wages, contribution) within 10 days of month end, and the principal files a Form XII abstract within 20 days. These form numbers are from secondary summaries; check the EPFO portal for the current procedure.
Injury, welfare and the licence
| Area | Principal employer’s liability | Law |
|---|---|---|
| Injury to a worker not in ESI | Liable for injuries on premises it controls; the worker may claim from either; the principal employer can claim it back from the contractor | SS Code s.85 |
| Welfare at its premises | Drinking water, toilets, washing, first aid; canteen at 100+ workers counting contract labour; crèche above 50 | OSH Code s.53; Central Rules rr.44–58 |
| Housing on far-off construction sites | Free temporary housing; the principal employer pays where the work is through a contractor | Central Rules r.62 |
| Unlicensed contractor | A principal employer using a contractor who needed a licence and had none is itself in contravention | OSH Code s.54 |
| Core activities | Contract labour is banned in core activities, except work normally done through contractors, work that is not full-time, or a sudden time-bound surge | OSH Code s.57; r.101 |
Contract workers doing the same or similar work as the principal employer’s own workers also get the same holidays, hours of work and other conditions of service (Central Rules r.93(2); check your state rule).
Verify: The old CLRA rule said “same wage rate” in so many words. The new rule says “conditions of service”; whether that covers equal wages is not settled.
What to send the principal employer every month
A clean monthly pack ends most disputes and gets bills cleared faster. Send it with the bill, not after the client asks.
- Wage annexure for the site: each worker, days, gross, deductions, net and the bank UTR.
- Wage slips (Form V) if the client asks for them in its own format, with the same figures as the bank payment.
- PF ECR summary and the paid challan (TRRN) for the month.
- ESI contribution and the paid challan.
- Attendance (muster roll) the bill is based on.
- Once, and again on renewal: the contract labour licence, the work order, the PF and ESI registrations and the compensation policy for workers outside ESI.
- Every six months: a copy of the Form XVIII return.
How ThekaFlow does this
Each site in ThekaFlow carries the principal employer, the work order number and date and the vendor code; these print on the wage slips, annexures and bills.
- After the bank payment, the Annexure for wage payment lists each worker with the UTR, ready to send to the principal employer (Professional plan).
- Client slips (Form V) are made in the client’s own Form B & D layout (Professional plan). Check that the figures match what you actually paid by bank before you hand them over; a slip that differs from the bank payment is a false record.
- The PF ECR and ESI files come from approved payroll; mark each challan paid with its date and number. A PF or ESI challan not marked paid by the 15th of the next month shows on the Law compliance page.
- Compliance documents keeps the licence, work order, PF / ESI registrations and the compensation policy, with alerts before they expire.
Guide: https://thekaflow.com/guide/statutory/ and https://thekaflow.com/guide/bank-payment/
Questions
My contractor has not paid wages. Does the company have to pay?
Yes. If the contractor has not paid within 7 days of the end of the wage period, the principal employer must pay within 15 days and then recover the amount from the contractor’s bills, as a debt, or from his security deposit.
Can the principal employer deduct PF paid for my workers from my bill?
Yes. A principal employer that pays PF or ESI dues for contract workers may recover them from the contractor. That is why clients check challans before releasing bills.
Is the principal employer liable if a contract worker is injured?
For a worker not covered by ESI, yes, where the injury happens on premises the principal employer controls. The worker may claim from either, and the principal employer can claim it back from the contractor.
Do I still have to pay wages in front of the client’s representative?
No. That old rule is gone. Wages are paid by bank or electronic transfer and the contractor informs the principal employer electronically of the amount paid.
हिंदी में
ठेके के मज़दूर का असली मालिक ठेकेदार है: वेतन, PF और ESI वही देता है। पर अगर ठेकेदार वेतन अवधि ख़त्म होने के 7 दिन में वेतन नहीं देता, तो प्रिंसिपल एम्प्लॉयर को 15 दिन में देना होता है और वह पैसा ठेकेदार के बिल या सिक्योरिटी से काटता है। PF और ESI में भी प्रिंसिपल एम्प्लॉयर भरकर ठेकेदार से वसूल सकता है, और जो मज़दूर ESI में नहीं है, उसकी परिसर में चोट पर भी वह ज़िम्मेदार है। इसलिए हर महीने वेतन और चालान का सबूत प्रिंसिपल एम्प्लॉयर को देना ठेकेदार के अपने फ़ायदे में है।
This is a plain-language guide, not legal advice. Laws, rates and dates change, and states issue their own rules. Always check the latest central or state notification, or ask your CA or labour consultant, before you act on it.