ThekaFlow

ThekaFlow for scaffolding & epc

Payroll software for scaffolding and EPC site contractors

Scaffolding thekedar ke andar bana — gang ki hazri, supplier ka commission, saaman ka stock, client ka bill

ThekaFlow grew out of the payroll system of an industrial scaffolding contractor with several sites and hundreds of workers, and is in daily use there. Refinery and EPC sites mean gate passes, sub-thekedar gangs, pipes and clamps on hire, and a principal employer that audits everything. Those needs are built in, not bolted on.

What goes wrong today

Aaj kya hota hai

  • Workers come through five sub-thekedars; each one’s commission is worked out on a phone call at month end, and nobody can show how.
  • Pipes, clamps, planks and couplers move between sites and the client’s bill — the purchase in one register, the stock in another, the rental line typed from memory.
  • The refinery gate wants ID cards, gate pass validity and police verification before a worker enters. The office finds the gap at the gate.
  • Height work and shifts mean OT every day; the 144-hour quarter cap is crossed before anyone counts.
  • The client’s audit asks for Form V, the wage annexure with UTR and Form XIII — three Excel files that never agree.

How ThekaFlow does it

Only what the app does today, with the plan each part is on. Rates and limits are on the pricing page.

Gang-wise attendance, gate pass and ID cards

Starter+

Every worker carries a supplier / gang, skill category, gate pass validity, police verification and documents; printable ID cards with photo, blood group and QR for the gate. The site sheet records P, half, 1½, 2 (double duty) and OT hours; on Starter the worker app marks hazri with GPS inside the site’s geofence.

Payroll with OT at 2×, PF / ESI and the 144-hour check

Starter+

Daily rate from the monthly wage ÷ 26, as the Central rules say for overtime, OT at twice the ordinary rate, a warning when a worker crosses 144 OT hours in a quarter, the minimum wage check (the state rate, or the Central CLC rate where the principal employer is in the Central sphere — refinery, PSU, port — and many PSU contracts ask for the higher of the two), PF 12% with the ceiling, ESI 0.75% / 3.25% rounded up, PT and LWF by state. Bank file for all sites, UTRs read back, slips in Hindi and English.

Supplier (sub-thekedar) portal and commission

Professional+

Commission per worker per month with skill-wise rates and a rate history; a worker who moves between suppliers moves on the right date. Each supplier logs in with mobile + PIN and sees own workers, their attendance and the month’s commission, in Hindi or English — you choose what they see. The supplier’s PAN is on record — without a PAN, TDS is 20%.

Scaffolding material: purchases, stock per site, on the bill

Professional+

Your own categories and items — pipes, clamps, planks, couplers, PPE — with HSN, GST %, sale and rental rate. A supervisor records a purchase with the vendor bill, someone with inventory rights approves it into stock. Stock per site and company store, transfers, adjustments, low-stock alerts, and an ITC register of the GST on purchases to match with GSTR-2B.

Client billing: manpower, material and rental on one invoice

Professional+

Pick the site and the month: manpower lines from attendance at the client’s rate with a worker-wise annexure, material and rental lines from inventory, any custom line. GST tax invoice (CGST + SGST or IGST) or bill of supply with your prefix and series; stock moves when the bill is issued. Payments, part payments, TDS, outstanding and overdue by client.

Form V, wage annexure and registers for the refinery’s audit

Professional+

Upload the principal employer’s Form B & D PDF and get Form V slips matched by UAN / Aadhaar / token number, the wage annexure with UTR and date, Form B values and statutory accruals. Registers Form I, IV, IX and XX per site and month (Starter) from the real attendance and the real bank payment.

Site expense fund, licences and the WC policy

Professional+

Cash given to the site supervisor, expenses with bill and GST photo, cash advances to workers, returns — the balance always visible, wrong entries voided, never deleted. Labour licence, workmen’s compensation policy, registrations and work orders in Compliance documents (every plan) with alerts 30 and 7 days before expiry.

What ThekaFlow does not do

  • ThekaFlow does not do scaffold design, load calculations, permits-to-work or safety inspections. Height-work standards follow the principal employer’s permit system and IS codes; the app records the people, the hours, the money and the material.
  • It does not file the half-yearly or annual contractor returns on the portal; it builds the site-wise figures as Excel and records when you filed.

The screens you would use

From the demo company “Demo Infra Services” — sample data, same app.

Printable worker ID cards with photo, blood group and QR
Gang-wise attendance, gate pass and ID cards
Monthly payroll in ThekaFlow: wages, OT, PF, ESI, advance recovery and net pay per worker
Payroll with OT at 2×, PF / ESI and the 144-hour check
Supplier (thekedar) commission for the month, skill-wise and worker-wise
Supplier (sub-thekedar) portal and commission
Inventory in ThekaFlow: scaffolding items with HSN, GST %, stock per site
Scaffolding material: purchases, stock per site, on the bill

Which plan

Per active worker per month, billed yearly, GST extra if applicable, no auto-debit. The Free plan (Up to 25 workers · 1 site) is free for life, no card.

Suggested plan

Professional · ₹25 / worker / month

Up to 1,000 workers · unlimited sites · Minimum ₹7,500 / month

Supplier portal and commission, inventory, client billing, Form V and the site fund are Professional-plan modules — the ones a scaffolding contractor uses every month — with unlimited sites.

Or start smaller

Starter · ₹35 / worker / month

Up to 500 workers · up to 3 sites · Minimum ₹3,500 / month

A contractor with own workers only, no sub-thekedars and no material billing, can run attendance, payroll, bank file and registers on Starter.

Compare all plans · How self-signup works

Questions scaffolding & epc ask

Is scaffolding work hazardous — can a 17-year-old work on it?

Treat it as hazardous. No child below 14 may be employed anywhere, and adolescents of 14 to 18 may not do hazardous work; construction, scaffolding and work at height should be treated as hazardous, so the safe rule is no worker under 18. BOCW registration itself starts at 18. ThekaFlow flags any worker without a date of birth and blocks anyone under 14.

What must I report if a scaffold collapses?

A dangerous occurrence such as a scaffold or structure collapse or a fall from height is reported to the Inspector within 12 hours, injury or not. A death is reported at once in Form XI (also the district authority, police and family); an injury that keeps a worker off for 48 hours or more within 12 hours after those 48 hours. Keep the accident register (Form XIX) (Central rules; your state’s OSH rules may use their own forms). ThekaFlow does not file these; store copies in Compliance documents.

How is a sub-thekedar’s commission worked out in ThekaFlow?

Per worker per month: present days × (the supplier’s rate for that skill ÷ 26 or 28, as the site is set), with OT where you have agreed it. Rates have effective dates, so a revision applies from the right month; a worker who moves to another supplier moves on the right date. The supplier sees the same figures in the portal; you download the month as Excel.

Do I deduct TDS when I pay a sub-thekedar?

Usually, under the Income-tax Act 2025 s.393(1) (the old s.194C), where a single bill is above ₹30,000 or the year’s total above ₹1 lakh: 1% where the payee’s PAN is of an individual or HUF, 2% for a firm, company or LLP, and 20% without a PAN. Deposit it by the 7th of the next month (for March, by 30 April) and file the quarterly statement. An individual or HUF thekedar whose turnover was below the tax-audit limit last year may not have to deduct — confirm with your CA; and a per-head commission to a labour supplier may be treated differently from a works contract — ask your CA. ThekaFlow keeps the supplier’s PAN on record; without a PAN the rate is 20%.

Can the client’s bill include pipes and clamps on rent?

Yes. Items in inventory carry a sale rate, a rental rate, HSN and GST %; the bill takes material or rental lines from inventory alongside the manpower lines from attendance, and stock moves when the bill is issued. GST on your own purchases of material goes to the ITC register.

Why was ThekaFlow built in a scaffolding company?

Because the founder ran that company’s payroll. ThekaFlow grew out of the payroll system of an industrial scaffolding and manpower contractor working on refinery and EPC projects, with several sites and hundreds of workers; the hazri sheet, advances, PF / ESI, bank file, supplier commission and Form V came from that daily work. It is in daily use there, not a template.

This is a plain-language guide, not legal advice. Laws, rates and dates change, and states issue their own rules. Always check the latest central or state notification, or ask your CA or labour consultant, before you act on it.

Try it with your own sites

Gangs, pipes and clamps, the refinery’s audit — one system, built on a scaffolding site

Open the live demo with sample data, or sign up free and put your own workers and one site on it in a minute. Move to a paid plan when you want payroll and the bank file — nothing is auto-debited.